Cat6 Plenum Shielded 1000ft 23AWG Solid Bare Copper Ethernet Cable I8739

Cat6 Plenum Shielded 1000ft 23AWG Solid Bare Copper Ethernet Cable I8739

1000ft / Black / Cat6 Plenum Shielded
Sale price  $39.50 Regular price $264.99
Skip to product information
Cat6 Plenum Shielded 1000ft 23AWG Solid Bare Copper Ethernet Cable I8739

Cat6 Plenum Shielded 1000ft 23AWG Solid Bare Copper Ethernet Cable I8739

Sale price  $39.50 Regular price $264.99
Shipping calculated at checkout.
Size1000ft
Color
StyleCat6 Plenum Shielded
Brand: Turnstone Cables Connector Type: RJ45 Cable Type: Ethernet Compatible Devices: Server Special Feature: High Speed - ✅ High-Speed Performance – Supports 10Gbps Ethernet up to 55 meters and 1Gbps up to 100 meters, with a 550MHz bandwidth for high-speed data transmission. - ✅ 100% Pure Copper Conductors – Constructed with 23AWG solid bare copper, ensuring low resistance, better conductivity, and minimal signal loss over long distances. - ✅ Shielded F/UTP Design – The aluminum foil shielding around the twisted pairs reduces electromagnetic interference (EMI) and crosstalk, delivering a stable and interference-free signal. - ✅ Plenum (CMP) Fire-Retardant Jacket – Engineered with a low-smoke, flame-retardant jacket, meeting NFPA 262 and TIA/EIA safety standards, making it safe for HVAC ducts, ceilings, and air-handling spaces. - ✅ Power Over Ethernet (PoE++) Ready – Fully supports PoE, PoE+, and PoE++ (4PPoE), making it perfect for IP cameras, VoIP phones, wireless access points, and other network-powered devices. - ✅ 1000ft Bulk Spool for Easy Installation – Comes in an easy-pull reel/spool, allowing for tangle-free, smooth installation, perfect for large networking projects. - ✅ Durable and Weather-Resistant – The shielded design provides extra durability and protection, making it ideal for noisy environments, industrial areas, and high-interference locations. - ✅ Versatile Applications – Suitable for data centers, commercial buildings, hospitals, schools, and smart home installations, ensuring fast and secure connectivity for routers, switches, security systems, and Ethernet extenders.

You may also like